: Use a chalk line on the floor to mark the placement of the units.
Need professional installation? Gunnebo certified integrators are listed on the company directory. For DIY installations, remember to perform the "Full Cycle Test" (500 open/close actions monitored via software log) before declaring the installation complete.
The includes a 5-year maintenance calendar. Adhering to this ensures the 5 million cycle rating of the motor. gunnebo speedstile fl installation manual
Do not lift the pedestal by the glass barrier or the top cover. Use the designated lifting handles on the steel chassis.
The concrete floor must be perfectly level, flat, and structurally sound. : Use a chalk line on the floor
Align the template precisely with your architectural centerlines using a chalk line or laser level.
The floor must be able to support the weight of the cabinets. A concrete sub-floor with a minimum resistance of fckcube 30N/mm² is recommended. Conduit Running: For DIY installations, remember to perform the "Full
If you need help clarifying a specific step during your setup, tell me:
🔒
Verify the clear lane width. Standard configurations typically require a 600 mm walkway, while wide/ADA lanes require 900 mm.